In class, presented several key points, as as:
I. brief summary and discussion of the new 5929 law, the discussion will clear up some doubts and many dark sides to concern us all. One is that the 1417 decree still in force.
II. Mission and vision of the construction company (for simulation).
CIUM : Construction and Inspection
Mission:
offering inspection, Projects and Management of Civil Works, to meet the needs of our customers for quality, response time and cost- benefit, working with a team of highly competitive and efficient by establishing harmonious working relations, collective benefits and professional development.
Vision:
• As a leader in inspection services and quality control of civil works.
• Possess a flexible and efficient organizational structure that allows us to have national coverage with projection throughout the country, appealing for the formation of strategic partnerships with national or foreign capital.
• distinguish ourselves by the permanence of their staff and their sense of belonging.
III. Unit: Fundamental principles of civil works inspection
This unit consists of:
a) Definition Inspection. "Inspection of Works is the exercise or professional services designed to ensure the smooth conduct of the work as a fundamental objective and addressing the overall objectives derived from the collective interest and specific objectives derived from the various interests involved in the total process work. "
b) Principles administrative
ü Planning
ü
Organization ü Integration
ü direction and control
c) Inspector Functions
ü Techniques: some of the main features is that the inspector should be fully aware of the plans and rules to follow during the execution of the work
ü Administrative . The inspector must possess qualities administrative.
ü Informative
ü Advisory
IV. Exhibition and definition of types of work and concrete curing.
1. Work Types
a) clean work: it is called in this way when looking for the concrete on its outer surface is completely smooth without any marks of the respective formwork
b) Obra Corriente. En esta obra no se busca obtener un acabado perfecto por la sencilla razón de que después de ser curado se le recubre mediante un friso
c) Obra vista. Se le denomina cuando el concreto puede quedar a la vista pero no necesariamente es obra limpia
2. Curado. Se le denomina como el manteniento de un adecuado contenido de humedad y temperatura en el concreto a edades tempranas, de manera que esta pueda desarrollarlas propiedades para las cuales fue diseñada la mezcla.
Rapporteurship developed by: Felix Herrera