Thursday, November 20, 2008

Commentaires Vermont Casting Defiant



A new 20 November. A date that reminds us period during which the fascists and the fascists, with Franco at the head, murdered and repressed the people and systematically left after giving a coup against a regime established by law.

Thirty-three years after the death of dictator Franco, from the Southeast antifascist we are obliged and forced to denounce and condemn the rise of fascism that we suffered in the English State today. A process that becomes more evident in the Region of Murcia, where censorship against anyone and those who think differently, against groups of all kinds who work for a better world is suffocating. The construction of a passive and homogeneous mass, in which there is no criticism, the tone, the richness of exchange difference is the basic social function of fascism. Examples are the execrable political censorship in Leo Bassi AlterArte and bands like Manu Chao, Banda Bassotti, or Fermín Muguruza, the shameful "raid" the police against immigrants in Torre Pacheco, the neo-Nazi National Alliance demonstration in Cartagena on May.

O in a more general European directives: the 65 hours and known as "Directive of Shame" that allows jailing immigrants without papers "from 6 to 18 months without judicial intervention or the law of parties royalty leaving thousands of citizens especially in Euskal Herria while fascist and xenophobic organizations enjoy impunity and so many more

A 20-N, So in which we must speak of a resurgence of fascism and the actions to remind the ever-present companion Carlos Javier Palomino, a 16 year old girl murdered by a fascist military last November 11, 2007

These

continuous right-wing groups perpetrate violent attacks, coming in too many cases of murder and pose a real terrorism against the immigrant community, LGBT, and all those struggling for social justice, against racism, next to the most vulnerable to exploitation and homelessness. "There is no doubt that these numerous actions constitute a terrorist fascist class? What no doubt that are protected and protected, either passively or actively, by the government?

finding is insulting every day this complicity, and how people criminalized, persecuted and stigmatized are the anti-fascist and anti-fascists. The outlawed our protests are the ones who received the police charges, and who appear in the mass media training as hazardous and dangerous criminals to remove. In a speech repeated insistently try to match fascists and antifascist, attack and defense, the executioner and victim.

And this is no accident. We live in a capitalist crisis brings job losses, job insecurity, massive debt and high inflation. And increased exploitation as already foreseen by the European Directive of 65 hours.

is in these circumstances when fascism arose as a necessity for the survival of the system itself.

note as increased emphasis on the messages that the immigrant community blamed the problems arising from the crisis and insecurity. Racist and xenophobic, often with the complicity of the authorities and institutions, begin preparing the culture medium required to download the crisis behind us, hiding the true and real culprits the situation with the lure of hate the different. For all that is necessary decisive action that inevitably must be united. Immigrants and indigenous people must work together against fascism in all its forms: the streets and the Parliament.

This year is punctuated by the Law of Historical Memory and Garzon's initiative to open a summary about the murders of anti-fascists under Franco. Us and we believe in the recovery of historical memory, but a fascist historical memory that does not distort the truth. Say next to the victims of fascism: truth, justice and reparation. We demand ban and condemnation of Franco and his followers and we accept it is equal to fascists and antifascist, a historical manipulation not only used in the context of the Civil War, but, as noted, we are experiencing the various anti-fascist groups in recent years.

20N In this, we must redouble our efforts for unity, because we can only defeat fascism with united action. With the ongoing work on centers of study, work, meetings and events and popular anti-fascist perspective. To put an end once and for all fascism both in the streets and in institutions. To address social change, a process democratic improving our living conditions and radical change to the heritage of the Franco regime.

Therefore, from here we call on all anti-fascist groups and individuals to join the Coordinator and endorse

This 20 and November 22 each and all go out into the street and say no to fascism in any form. Say no to racism and xenophobia working for coexistence between cultures and peoples. No censorship or manipulation by the political power of art and music . Enough of fascist aggression. It is time for the organization and struggle.

CARLOS S BROTHER WE ARE NOT FORGET!

AGAINST FASCISM AND VIOLENCE TODAY AND ALWAYS RESISTANCE!

Tuesday, November 11, 2008

Carlo Robelli Guitar Archive

Manifest 20-N CONCENTRATIONS IN MURCIA AND CARTAGENA





The November 11 marks the first anniversary of the murder of young antifascist Carlos Javier Palomino, at the hands of a soldier who was addressing a racist and xenophobic manifestations.

Therefore, from the Anti-Fascist platform antifascist Cartagena and the Southeast, we want to remember him and all victims by concentrations of fascism. Cartagena


Tuesday, 11 November - Icue Square at 20.00. Murcia


Saturday November 22 - Departure from the Town Hall at 20.00.

THE BEST TRIBUTE TO CONTINUE THE FIGHT!

Wednesday, July 9, 2008

Printable Washington Dc Attraction Maps

Dismantle isolationist strategy the media from anti-fascism Mavi

isolationist strategy Dismantle the media from anti-fascism

x antifascist Madrid


"extremes meet" , that is the maximum spread by the media in recent weeks, whose essence is equal to youth with the neo-fascist. Interestingly solidarity and anti-racist youth are matched with those advocating racism and xenophobia.
"I'm a fascist"
"I'm a fascist" , they said happily Mercedes Milà Esteban Ibarra on 19 June in the trash program "Daily Extremes hate ..." . That is, put on the table the existence of an alleged democratic anti-fascism, claiming solidarity values \u200b\u200bbut remained respectful of the capitalist system and especially "without using violence." This argument intended to draw a line between the Democratic antifascist and anti-fascism violent. According to this thesis, the alleged use of violence is the basic method that equates anti-fascists with the fascists, using both forms of expression groups also "Radicals" and "extreme."
The purpose of insisting that argument is to socially isolate the real anti-fascist movement, which fights in the streets because they understand that fascism is a tool of capitalism to intimidate the social sectors in fight for basic rights of individuals and it also understands that is not democratic the privatized health system, which commercialized education, precarious work, who lives next to the real estate mafia and with institutional corruption. That is, there is no anti-fascism "democratic" capitalist system does not fight or their guardians face plant street: the Nazis.
"The fascists looking for a dead
media recently have had enough to publish lists of alleged attacks by fascist groups against neo-Nazi groups. But what they do is spread the other list, the list of how he began to strengthen the self-fascist, anti-fascists how are self-organizing to fight the Nazis in a mere human act of survival and political struggle. "After the murder of Carlos Palomino, anti-fascists looking for a dead to avenge his death" , says the press. But what is not said is that in 2007 a Congolese man was quadriplegic Alcalá de Henares after neo-Nazis beat that in 2005 the young Madrid Ramón was stabbed near the heart in San Sebastian de los Reyes, Roger was killed by a neo-Nazi in 2004 in Barcelona ..., and a long list savage attacks.
Since 1991 there have been at least 38 murders at the hands of neo-Nazis. The victims are immigrants, beggars, young anti-fascists and even young people without specific ideology.
Last November 2007, there were three known Nazi aggression before November 11th unfortunate he was killed Carlos Palomino. Two of them against immigrants and against young people on the left. Throughout the month of November 2007 have been posted 21 right-wing attacks, in December 2007 at least 18, in January 2008 at least 24 attacks, in February 2008 at least 18 ... These data can be confirmed by collecting information from alternative media and even at times of small news from the mainstream press, as the case of El Pais, which reported a "report Raxen" asserting that in 2007 there were 600 attacks Nazi (almost 2 per day on average).
The violent attacks on neo-Nazi hands, in some cases, including deaths, have occurred every year and killing Carlos has been, so far, the highlight of the upward trend of fascism in the English state. Moreover, from the November 11, 2007, in Europe have been murdered by neo-Nazi groups Jan Kucera (January 18, 2008, Czech Republic), Alexei Krylov (March 16, 2008, Moscow) and Nicola Tommasoli (5 May 2008, Italy).
words, those who kill and are actively looking for neo-Nazis killed. And who are dying and suffering from the threat of neo-Nazi violence are immigrants, beggars, homosexuals, anti-fascist and anti-capitalist activists in general. That's not what the media say, do not say that the resurgence of fascist self is a product of the continuing extreme violence of neo-Nazis, and therefore it is absolutely legitimate. They say that state security forces are nurseries fascists, do not talk about blatant connections (often family) between the police and the Nazi or fascist youth receive training in the English army. It seems no coincidence that the murderer of Carlos Palomino was Nazi and military, but it is not.
"The murder of Carlos unleashed a wave of riots"
The press tries to public relations with the murder of Carlos words such as "riots", "violence", "gangs" ... misconstruing legitimate antifascist clamor to an event so painful and unjust as the one in Metro Legazpi on 11 November.
"The Carlos assassination triggered a wave of riots and riots to avenge his death ", said the recent television assembly Mercedes Mila, intentionally hiding after the murder that was especially popular protests fascist peaceful. One of them took place in the district Usera convened on November 15 by the Coordinator of Neighborhood Associations Usera. The next day, another demonstration took place, this of enormous dimensions, convened by the Coordinator of Neighborhood Associations Vallekas. Thousands of residents took to the streets antifascist to repudiate the murder of Carlos. Not only that, the Delegation of the Government permitted several far-right demonstrations those days, while prohibiting the antifascist rally in Madrid on November 24, expected peaceful and mass participation. Later
other demonstrations have been conducted as a concentration Madrid called by antifascist on 9 February from the Superior Court of Justice in Madrid against the legalization of fascist and xenophobic acts, but remember this is not television. Media
attempt to erase from history many demonstrations that followed the death of Carlos, and focus solely on specific acts of self-defense against neo-Nazi provocations, such as the attempt to place certified concentration Nation and the Nazi Party in Revolution Plaza Tirso de Molina on 29 February. This concentration, which did not last ten minutes, was allowed by the authorities but banned by the action of neighborhood residents and anti-fascist movement.
Likewise, the Madrid antifascist attempted a merger "against the criminalization of social movements" on 5 April in Tirso de Molina. The rally was banned by the government delegation and although was also the media appeared not expecting that, to be peaceful, there would be fodder for sell as "quarrels".
is the government who gives free rein the Nazis and prevents the development and growth of a popular anti-fascist movement, banning many of their demonstrations and hiding their roots and working-class neighborhood. Are the media that fit the "reality" of government interests.
MADRID antifascist

Buy Dunlop Volleys New Zealand

Letter (mother of Carlos Palomino): Where's my interview?

TV presenter interviewed Mercedes Mila Mavi, mother of Carlos Palomino for his story "Diary of ... The extreme hate ( [1] , [2] ), issued on 19 June. After Mavi watching the report made some incisive clarification through a letter published to support its request for dissemination.

[Letter Mavi, June 20, 2007]
Where's my interview?

Well, after my anger cool slightly, although not entirely, I will present something about the "Diary", which aired last night, the first thing is that I feel completely deceived (not manipulated) because I have to admit that nothing about my interview was handled, simply cut, Vetoed, EXIST, so I ask myself, Where the hell is my interview? WHERE IS THE DEFENSE AND PUBLIC COMPLAINTS I recorded? WHERE IS THE INTERVIEW THAT MADE FRIENDS OF CARLOS? WHY ONE OF infiltrate anti-fascists? WHY NOT ANOTHER BETWEEN infiltrating neo-Nazi? HOW CAN YOU GET AN INTERVIEW terrors like that lawyer, OWNED A 'NATION AND REVOLUTION' AND ALLOW TO SAY THAT AMOUNT OF STOLEN AND EGGS HAVE NO SAY IN YOUR FACE LIAR?

now and then analyze a little, I see the reality, my interview was not appropriate to come out, it was too dangerous because ACCUSED THE GOVERNMENT, OFFICE OF GOVERNMENT, SUPREME COURT ... clear in that interview and openly criminalizes the Nazis, and their advocates who support and provide coverage to continue doing their killings, in the interview clearly said they were THE M. OF THOSE IN POWER, and therefore no interest or criminalize it illegal, because they are the ones who do the dirty work of the men who go out with a razor cuts hair, and beautiful costumes ...

Why not leave my public denunciation, I head directly to the Minister of Interior Mr. Rubalcaba, when in the first month all was good but overall little words following them?. Why not come out that directly asked the interior ministry that the case of Carlos was tried by a terrorist act as contemplated in 577 of the penal code, and denied saying he did not find evidence of such facts, washing hands and referring back to the Supreme Court to delay the trial as much as possible when it is recognized criminal?. Why not leave the accusation that I made to the Clean Hands, by ordering the banning of the Coordinator [Fascist], when its president is the one who should be out playing, having your hands completely stained with blood?. Why not leave the defense of the fascists did their jobs and their recognition within the law when considering personally had every right to be legalized, since their only crimes were fight the injustices that were taking place, including immigration, labor, exploitation and human rights?. Why are you always looking for equality between the two groups when they were actually well-marked differences existed between the two, and the most principal and I asked who had the courage to keep my mouth shut is a list of the dead killed by anti-fascism and by the Nazis?. Why not come out that ask you to be labeled as terrorists as the victims of AVT?, What happened, the police, civil guards and military council, their lives were more important than my son and that of others killed in the anti-fascist movement?

for me were just as important, were the victims fall into the hands of terrorists who do not respect life, I have the same political ideology to defend, TERRORISM IS THE ONE WHO DOES NOT RESPECT THE LIFE OF ANY PERSON JUST FOR POLITICAL IDEOLOGY, SEA OF RIGHT OR LEFT ... And why the victims of anti-fascism were not recognized, or aided as they are the victims of AVT?. Why bother because some anti-fascist parties are not given his conviction for these victims?. And I wonder, why the AVT still has not deigned to condemn the death of my son and many former fascists?, Are more Category yours?

Gentlemen, open your eyes and see the reality of what we want to sell, we want to have like 50 or 60 years ago, they want to have the power that these dates have not finished assimilating the fascism and Nazism already past stories, dead and buried, but the harsh reality is that the racks are acting with impunity. Why in the cradle of fascism are forbidden any kind of neo-Nazi demonstrations and here we are so "tolerant" of authorizing we? and denying all the anti-fascist movements fighting for the truth?. Why not leave my personal conviction to Mrs. Soledad Mestre, to which the accused between the chambers that thanks to their permissiveness and authorization to that concentration of 11/11/2007 to DN, my son is dead?.

All responsibility for the death of Charles the I lie about it, if this person had not consented to this event racist, my son would be alive today, since that element that killed him had not requested permission to move his headquarters to a concentration patriot and would never have crossed with my son ...

interest Why I came to fathom, still insist it's a fight between gangs, or in the fray?, What are you afraid?. Why are delaying both the trial if it is all very clear and the video speaks for itself?

Well here's a short summary of what was the interview with Mila, and has been totally banned ... after much persistence on your part to give it to him, what happens, they encountered a wall would be unable to handle or carry on where they wanted? Sorry, and this will ... Now if he should have to do some further clarification be live, no recordings of any kind ... His program has disappointed me greatly. Has shown on both sides, yes, okay, but did not show the reality of both. In fascism, violence, more violence and more, but why not say why?. Because they are not allowed to speak freely, the first response they receive is always a police charge, ordered by the officers and they have to defend to no end, surely, brutally beaten, as happened in the last of Sol [1 June], to not end with the eyes taken out by a ball, as happened to the kid Tirso [February 29], etc ...

police went to Mr belonging to the union talking about them, I say, "you left and neo-Nazi ideology?. I still remember him for the murder of a girl of 17 in the Institute Tirso de Molina, did you forget?. Check your history Mr. defender Murderers.

The truth is always very powerful, dangerous yes, but powerful, and there is no truth to the aftermaths ... and I speak the truth, my truth, and is what will keep screaming until I was speechless ... You lose a fight, but the battle is still on the field ... and I'm still standing, continuous and therefore continue the path that my son was cut in one way or another ...

Now make your own conclusions, and the feeling of disappointment that I can now be accompanied by much pain and much more anger, which will give me the strength to keep going ... Now more than ever and started talking Mavi there is only one way to shut her up ... if you are so brave, here I am.

CARLOS, FOR YOU AND WHAT KILLED BY BEING A FULL AND FAIR will be here ... I LOVE YOU ... 2007

Wednesday, June 25, 2008

Do You Need Explorer Bag

I Festival of sexual freedoms and civil rights. ATTENTION



I Festival of sexual freedoms and civil rights.
June 28: LGBT Pride Day.


In Concert:

Remembrances - Gothic Metal
http://www.myspace.com/remembra NCES

ETXALAR Celery - PunkRock
http:// www.myspace.com / etxaleap Io

TDA - Punk

Dammy MC, Nikah and Keon - Rap & Reggae
http://www.myspace.com/keonmc

From 19:30 h in The enclosure Fica (Murcia)
Free Entry

Organizers: No Te Prives and Southeast antifascist

Attend and give a kick to the homophobia and intolerance!

------------------------------ ------------- ----------------- -----



Press Release This Saturday June 28 is celebrated in Murcia I Festival of sexual freedoms and civil rights within the LGBT Pride Day.
It will start from 19:30 pm on the campus of La Fica, where he performed concerts and different activities open to all citizens.

The festival organized by the group No Te Prives (LGBT) and Southeast antifascist, serve the following groups: Remembrances



-Celery-ETXALAR
-Dammy
MC, Nikah and Keon-TDA



------------------------------ ---------------- -------------- -----
That same morning, at 12 St. Sunday snacks, concentration and reading a manifesto against homophobia, intolerance and the LGBT Pride.


Other LGBT weeks activities: www.noteprives.es

Friday, June 13, 2008

Mucinex Rash Upper Body

waiting for a new attack on David ... Change Password

Hello friends.,
here we are. You can use this avenue to express their professional advancement. Since a few months and signed as RBdeV engineers. I am happy ..! If not David, reveals the key again. (O Fabrizzio?)
Greetings to all and God's care and guidance. Alberto

Thursday, June 12, 2008

Listerine For Ingrown Hairs

future! Final conclucion

Professor ... If the key again to change the group or the Blog of "Metropolitan" .. Please let us know, so we can continue to be entering and using this tool, in case we needed. With

Fabritzio to give the idea of \u200b\u200bchanging the key. Jeje
Greetings to all
David Shiffman

Electric Box For Iphone Walkthrough Level 19

Planning and Inspection

First accept my best regards, I write in this Lock to express my comments and conclusions of the Planning and Inspection material work.

the end of this semester, I am closing a stage in my life while opening a very important for my future career. Through this kind of planning and inspection work, I feel more prepared and have the tools necessary to deal with order and basic fundamentals of any business or opportunity that comes my future.

In the professional world there is greater competition between companies, institutions and professionals, wherein a result, there is the importance of an Engineer has the tools necessary to manage, secure, troubleshoot, monitor and ensure problems workspace.

With the tools learned this semester we learned about several key variables for a good engineer inspector, such as: administrative, industrial safety, techniques and fundamentals, productivity, quality, among others. Thus, taking this knowledge and knowing how to apply them in the workplace, my colleagues and I drove a big advantage over many of the current labor competition in our area of \u200b\u200bwork as civil engineers.

Finally I say goodbye, thanking the professor Alberto Linder for having transmitted all his knowledge as a successful professional in our country.

health and success to all
Sincerely, David Shiffman

# 3200150

Wednesday, June 11, 2008

Where Does The Leather In Cricket Balls Come From

CLOSING HALF ...!! 10/06/1908 Rapporteurship

FRIENDS.
already in the final stretch and closed the last rapporteur made this process of knowledge transfer. The rapporteurs are
sort of Key to the cycle of knowledge. Yesterday I commented on the EDA, after-action evaluation, the same as the Wheel of Learning Kolb,
happened to us?
Because we did that happen?
What I learned from that?
do I do next?
If we can answer that in a page, we have learned and help others to make no mistake.
This semester has been strong for you and for me, just hope I have fulfilled my role.
The matter is called Planning and Inspection of Civil Works .. that is the same as Planficación and control of works in execution. That is, the whole process. Be
now they will not remember what I taught, but I am convinced as I have lived for 18 years of teaching, that knowledge matures, it incorporates changes us.
not forget the parameters: Ethics, security, planning, communication and control, much control
wish to become the best inspectors who may become, they can always count on me.,
Greetings Colleagues (almost)., Alberto
Lindner

How Much Power Does A Laptop Use

class

Good morning, Class of yesterday 06/10/2008, continue with the workshop ponenecias productivity in construction, specifically the session # 6 "Gangs collaborative and PIC, including points discussed were:

* How is made a PIC?
short-range plan lasts for 15 days, so that each 7 is conducting the review of the plan and is prepared for the next quincenna.

The PIC, you have two faces:
* Front: This indicates the previous progress made, review the master plan, the list of incomplete activities, regoge executed man hours, predicts the time for each task, identify all tasks each activity, all the man hours devoted to each task for each activity and place all the information about the painting and the gang.
* Rear: Name of the project, each activity and task is placed MO future requirements, materials and equipment, described the need for information, documents and business plans, describes the need for information, plans and documents for each activity, place the number of people per crew, the balance of them if necessary, and develops the plan future contingency.

is this point we stopped to discuss how to perform the analysis of man-hours and performance as reflected carried H / h.

* Another point discussed in class yesterday was the relevance and ultilidad to conduct a post project review, which is nothing more than the book analyzes the work is complete, and it is called a one page report, which intrrogantes include the following: what happened?, why now?, what learning? and how could you do better?

* Daily work should consider: The identification of tasks to be completed, scheduling of work according to needs, the daily monitoring of the progress of work, among other activities.

* Returning to the theme of collaborative teams, are structured clarify this: You must hold meetings 2 times a day, AM: PM is planned and evaluated, should not take more than 10 min, check that you understand everything treaty and always emphasize the importance of safety!

* Role of teacher in the CC: this should be a facilitator of the process, indicate goals for performance and motivate the crew to share information and work.

* Role of teachers in the PIC'S

* How important is the construction supervisor? This takes between 60 and 100 day decisions that affect time, cost, quality or safety of the project

* Activity effective supervisor roles, our approaches were: technical competence, focuses on production, risk and cost, focuses on planning not only reception and quality and safety priority does

* Reasons for low productivity growth in the construction industry: among these are low investment in education and focus on results rather than process

* Items for increased productivity : Continuing education and practice and procedures
consistent
* For the ultimate in productivity workshop named the proram of 13 points to improve the construction productivist

* And stay final reflection: HAPPY TRIP ... QUALITY!
extra
As we explore the project and its use tool


ISABEL MULLER # 3202710

Thursday, May 22, 2008

Were To Get Proto Scooter Wheels




In class the day of Tuesday 20 May 2008, it spent the first minutes of the class and explain the sheets that were placed in group last Thursday, regarding the process in the company SIPOC CIUM.

then continued with the workshop productivity recalling its five main criteria:

-
Productivity - Performance
- Effectiveness
-
Efficiency - Efficiency

was started naming the general notion

- FIM productivity is the Fund for Research and Improvement of Productivity and Quality
- is the product of a agreement between the CAF and Conindustria

The FIM program is aimed at:

- Promote the need to increase the quality and productivity, as a way to be more competitive in a globalized world and become more competitive in the sub-region.
- Perform practical experience to demonstrate and implement these new management concepts.
- disseminate methodologies proven in other countries, encouraging country-specific languages.

First steps in the process of Quality Improvement and Productivity

• Objectives: Start

or organizational change process to achieve a productivity-oriented culture, Quality and Human Capital for:

- Achieve total customer satisfaction
- Building
zero defects - zero waste
Building - Develop works with zero inventories
- Delivery of works, "Just on time!"
- Efficient use of resources
- Production effective
products - Efficiency in the First Steps process

in the process of Quality Improvement and Productivity
• Steps:
- Decision and commitment
Senior Management - Policy Definition of Quality and productivity
- Achieve overcome resistance to change by the collaborative work of members .
- Identification of typical problems to be solved with whom one lives on a daily basis, forming the typical management or "management by crisis"
- systemic vision of the production process involving the Human Capital


General Steps to follow Continuous Improvement cycles:

1. Determination of current productivity levels. (Photo)
2. Analysis of root causes or factors that explain those deviations and prioritize them according to their consequences
3. Setting Goals to be achieved and projects that eliminate the causes assessed.
4. Definition of actions to overcome the deficiencies
5. Implementation of actions and impact monitoring
6. Evaluate results
7. Recognize and reward achievements
8. Start a new cycle

The 10 activities in the process of change:

- Get top management commitment
- Set
Improvement Committee - Engaging middle management
- Ensure the participation of workers in teams
- Get individual participation
- Establish systems improvement teams
- Develop activities that ensure the quality of
systems - Develop and implement plans to improve short-term
- Establish a system of recognition

is pending the completion of an activity, are encouraged to attend the next class and will be of great interest to all. GONCALVES LIZBETH

Saturday, May 17, 2008

Lovemaking En Streaming

CONCERTS ARE SUSPENDED DAYS DAYS

The council has refused permission citing complaints from neighbors
. Therefore, the concerts are suspended for another date,
rest of the days following their normal course.

Sorry for the inconvenience.

Friday, May 16, 2008

Poglądy Heraklita Na Wojnę I Pokój

Productivity and Process FIM SIPOC

05/15/2008
Rapporteur: Gabriel Perez
Carnet: 1015600

Good Afternoon in the class of the process was spoken 5/15/1908 SIPOC speak to them later and then approach this process a class activity related to the process CIUM SIPOC in the company.
work with CIUM mission is: CIUM * is "Mission:
offering inspection, Projects and Management of Civil Works, to meet the needs of our customers for quality, response time and cost / benefit acting as a highly competitive and efficient by establishing harmonious working relations, collective benefits and professional development. And eventually he reliza
activity says Inspectra Given the mission description and diagram of a system of production of goods or services, design Inspectra diagram, with a creative design of your choice, including the following words
SIPOC
PROCESS: A technique that relates the inputs, suppliers, threads, or stages of the process activities, outputs and customers to see the whole process as a whole and their relations with other processes.
ADVICE ON MAPPING THE PROCESS
• Involve people who know (Focus to) The "How"
• Clarify the limits of the defined process stages (brainstorming) - Writing on Post-Its
or use verbs Who
or Not Include Stages in the description of
• Combine, Delete Duplicates, Clarify Stages Stages Organize proper flow and add arrows
• Respecting Boundaries
• Do not start PROBLEM SOLUTION
• Validate and Refine before Analyze
1. RECOMMENDED TOOLS FOR
Process Management Process Mapping Matrix
Cause Effect Diagram Pareto
tabulation (key inputs)
KPIV'sa control (KEY INPUT VARIABLES PROCESS) are identified for control and assurance because they relate to KPOV 's OUTPUT VARIABLES key process related to critical features of quality CTQ'so)

FMEA Control Plans: If you apply the ability Studio + FMEA process reveals where the opportunities for improvement

Improvement Plan 5 . ROLE
MANAGEMENT Senior management must be committed to effective implementation of quality systems and prove it. The best way to lead, participate and show their commitment is to devote time to the Quality System and leading the efforts to implement the quality system in the function where each individual is responsible.
Some ways to show commitment:
• Attending courses, seminars and conferences.
• Participate in and chair meetings relating to quality issues.
• Attending as delegates and / or speakers at conferences and events inside and outside the organization.
• Speak to the workers. • Provide resources
necessary: \u200b\u200bit is to ensure that available to support the seven M:
• MAN (TRAINED AND QUALIFIED PERSONNEL)
• Methods (processes using appropriate technology)
• MATERIALS (PARTS, INGREDIENTS, DOCUMENTS)
• MEDIA ( ENVIRONMENT, TIME)
• MOTIVATION (creativity, spirit of AID, ATTITUDE)
• CURRENCY (financial support)
• Issuing and disseminating policies and procedures • To support organizational measures

• appoint the representative of the quality management
• Define the structure for quality
• Develop actions to ensure an enabling environment within the organization.
• Recognize good performance
1.
MANAGEMENT RESPONSIBILITIES • Establish and maintain the Policy Objectives and
• Promote Quality Objectives and Quality Policy
organization • Ensure attention to customer requirements
• Ensure the implementation of appropriate processes to facilitate compliance with quality objectives and customer requirements
• Establish an effective and efficient QMS and keep
• Ensure the availability of resources
• Inspect Quality System regularly
• Make decisions about actions related to the Objectives and Quality Policy
• Making decisions for the improvement of the Quality System
1. QUALITY POLICY AND OBJECTIVES
quality policy and quality objectives are established to provide a reference point to guide the organization. Both determine the desired results and help the organization to apply its resources to achieve those results. The quality policy provides a framework for establishing and reviewing quality objectives, quality goals must be consistent with quality policy and commitment to continuous improvement and its achievement should be measurable. The achievement of the objectives of quality can have a positive impact on product quality, operational efficiency and financial performance and consequently on satisfaction.
quality policy is the guidelines and objectives of an organization related to quality, expressed formally by the highest level of the organization, must be consistent with the overall policy of the organization and provide a framework for the establishment of quality objectives.
5.
DOCUMENTATION The documentation helps:
a) achieve compliance with customer requirements and improving quality;
b) provide appropriate training
c) repeatability and traceability;
d) provide objective evidence, and
e) evaluate the effectiveness and continued suitability of the system of quality management.
The preparation of the documentation should not be an end in itself, but should be an activity that provides value.
This requires that DOCUMENT WHAT TO DO (excused), DO WHAT YOU WROTE AND Prove it.
document types:
• Documents defining the purpose and direction of an organization (policies and objectives.)
• Documents providing information on the organization's QMS (quality manual).
• Documents describing how the QMS applies to specific projects or contracts (quality plans.)
• Documents providing information relating to specific activities (procedures).
• Documents providing objective evidence of activities performed or results (records).
What to include in the documentation of the quality system
• Documented statements of quality policy and objectives
• A quality manual
• 6 documented procedures required by the standard
-
documentation control - control
records - internal audit
- control of nonconforming product
-
corrective action - preventive actions
• Documents needed to ensure planning, operation and process control
• Records to provide evidence of conformity to requirements and as of the effective operation of the QMS.
hierarchical levels of documentation:

CONTROL OF DOCUMENTS
• Approve documents prior to issue
• Review, update and re-approved
where necessary.
• Ensure the review status. The changes are identified
• Ensure relevant versions are available which are used
• Ensure that they are easily identifiable and readable.
• Ensure that documents of external origin are identified and their distribution controlled.
• Prevent use of obsolete documents and identify them properly if kept for any reason. PROCEDURES

• are organized by "natural" processes
• Say: Who - How - When - Where - For What
• Can be multi - or monodepartamento.
• Available in point of use.
• are prepared to be met.
• must be modified whenever necessary.
a written procedure:
• Community: How to make things happen
• EVITA: IMPROVISATION AND THE MEMORY
• Synthesize: THE CONDUCT OF ACTIVITIES
procedures of interest to:
• Readers / user training / knowledge
• Directors: improved monitoring / consistency
• Customers: confidence in the quality.
• Regulators: compliance
• Auditors: a. Internal /
certification must include:
1. Objective: aim of the
2. Range:
application limits 3. References: other documents that founded and / or complement.
4. Definitions: concepts and key terms, acronyms, abbreviations.
5. Responsibilities: respondents for the adoption, implementation, execution.
6. Prerequisites: orgnizativas technical conditions to be met before starting development actions (usually not necessary for the proceedings admnistrativos).
7. Development: description logic, complete and consistent actions to be executed, contains quality system requirements (requirements, actions)
8. ANNEXES documents (tables, graphs, diagrams, models, etc.) necessary for performing the procedure or which are com result thereof, each annex shall be identified as constituting registration such. WORKING INSTRUCTIONS

• They originate from the proceedings.
• They are "standalone".
• Available in the workplace. • detailing precisely
activities.
• DESCRIBE: "Who," how, "when," by what means ... the activities are
RECORDS
must demonstrate that:
• The activities are conducted as required.
• The results are adequate.
• In the event that they are not, will act to address the causes and eliminate them. Control of records

• are maintained to provide evidence of compliance with requirements, as well as of the effective operation of the QMS
• Must remain legible, readily identifiable and retrievable
• Documented procedure to define the controls for: • identifying

• storage
protection
• • •
recovery retention time

Records • the provision required by rule 5.6.1
reviews by management.
6.2.2. (E) Education, training, skills and experience.
7.1 (d) Evidence that the realization processes and resulting product meet requirements. 7.2.2 Results
review requirements related to the product and actions arising from it. 7.3.2
input elements for the design and development.
7.3.4 Results of design and development reviews and any necessary action. 7.3.5 Results
verifiación design and development and any necessary action.
7.3.6 Results of design and development validation and any necessary action.
7.4.1 Results of supplier evaluations and any necessary actions arising from them.
7.5.2 (d) required by the organization to demonstrate the validation of processes where the resulting output elements can not be verified by monitoring or measurement.
7.5.3 To record the unique identification of the product where traceability is a requirement.
client 7.5.4 Any property that is lost, damaged or in any way that is deemed unsuitable for use.
7.6 (a) When the patterns used for calibration or verification of measuring equipment does not exist.
7.6 To assess the validity of previous measuring results when it detects that the computer is not in accordance with the requirements.
7.6 Results of calibration and verification of measurement equipment.
8.2.2 Results of Internal Audits.
8.2.4 Evidence of product conformity with the criteria acceptance and identification of persons authorizing the release of the product.
8.3 Nature of product nonconformities and any subsequent actions taken, including concessions obtained.
8.5.2 Results of corrective actions taken.
8.5.3 Results of preventive action taken. DEVELOPMENT




1. THE MANAGEMENT OF THE ISO 9000:2000 QUALITY
defines the Quality Management and coordinated activities to direct and control an organization with regard to quality.
In general we can define the quality management as the aspect of the overall management of the company that determines and implements
quality policy with the aim of guiding the activities of the Company to obtain and maintain the quality of the product or service, in accordance with customer needs.
With the new paradigms, the concept "Customer" goes beyond the external customer, end customer, traditionally identified as that buys or pays for a product or service. Within a company, the receiver of a product or service, whether finished or semi-processed, can and should be considered customer.
This same philosophy can be applied to the term "supplier." Now within the company, we can speak of a relationship "customer-supplier" continues, where each receiver has needs and expectations, as "internal customers", their "internal supplier" should satisfy.
Customer services - supplier


SYSTEM QUALITY MANAGEMENT must be integrated into the processes, procedures, work instructions, measurements and controls, etc., The company's own operations.
is a management system to direct and control an organization with regard to quality (ISO9000: 2000), therefore, is integrated into the operations of the company or organization and serves to ensure proper operation and control at all times.
It also provides tools for the implementation of actions to prevent defects or problems (Procedure for preventive action), and to correct them. It also includes resources, human and material, and the responsibilities of the first, organized properly to meet their functional objectives.
WHY THE SYSTEM OF QUALITY MANAGEMENT?
The adoption of a system of quality management arises from a strategic decision of top management, motivated by intentions to improve their performance, because they are developing a system of continuous improvement to provide policy guidance to staff clearly defined aspects specific work, to be certified by a third of your system management. or environmental demands.
BENEFITS MANAGEMENT SYSTEM OF QUALITY.
Some advantages gained from the definition, development and implementation of a System of Quality Management are:
From the external point of view:
• Enhances company image in front of customers and prospects a way to improve continuous level of satisfaction. This increases confidence in the customer-supplier relationships is a source of generating new revenue.
• Ensures quality in business relationships.
• Facilitates the removal of products / services abroad to ensure the companies receiving the fulfillment of the requirements quality, enabling entry into new markets or expanding existing ones abroad.
From the internal point of view:
• Improved quality of products and services resulting from more efficient processes for different functions of the organization.
• Introduce the vision of quality in organizations: Promoting the continuous improvement of the operating structures of internal and external demands a certain level of quality management systems, products and services.
• decrease costs (costs not quality) and grow revenues (possibility of going to new customers, higher current orders, etc.).
SYSTEM RISKS QUALITY MANAGEMENT.
The establishment of systems of quality management has its risks if it is assumed as an opportunity to improve a given situation.
• The development of these systems provides sensing elements generating activities rather than quality, but if not used and developed taking into account all the circumstances of the activity may be generating unnecessary bureaucracy and unnecessary complications for the activities.
• Do not get the commitment and collaboration of all concerned. It should communicate goals and responsibilities.
• Poor communication can lead to create significant barriers to the development of analysis and implementation of measures by unfounded fears.
2. STANDARDS OF THE ISO 9000 SERIES
What is
ISO ISO (International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which it has established a technical committee has the right to be represented on that committee. International organizations, public and private, in liaison with ISO, also take part in the work. ISO collaborates closely International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
International Standards are published in accordance with the rules set out in Part 3 of the ISO / IEC. The Draft International Standards (FDIS) adopted by the technical committees are circulated to member bodies for voting. Publication as an International Standard requires approval by at least 75% of the member bodies voting. ISO 9000, have been prepared by Technical Committee ISO / TC 176, Quality Management and Quality Assurance.

The ISO 9000 series is a practical and proven method for managing quality effectively consists of a set of separate documents, but related, international standards for defining management systems quality. They were developed with the goal of documenting the elements of a system of this kind in an organization to maintain a system of effective quality management. The series does not determine specific technologies or techniques to be used.
International Standards ISO 9001 and ISO 9004 are a consistent pair of standards on quality management. ISO 9001 is geared to ensuring product quality and increase customer satisfaction, while ISO 9004 has a broader perspective on quality management to provide guidance on improving performance.
the words of H. James Harrington. "The ISO 9000 series does not define the best system of quality management, but is an excellent starting point and provides a solid foundation for its construction."
The ISO 9000 family of standards have been developed to assist organizations of all sizes and types in the implementation and operation of systems for effective quality management.

- The ISO 9000 standard describes the fundamentals of the systems of quality management and specifies the terminology for the systems of quality management.
- ISO 9001 specifies requirements for the systems of quality management apply to any organization that needs to demonstrate its ability to provide products that meet customer requirements and regulatory requirements that apply to you and your goal is to increase customer satisfaction.
- ISO 9004 provides guidelines that consider both the effectiveness and efficiency of quality management. The purpose of this rule is to improve organizational performance and customer satisfaction and other stakeholders.
- ISO 19011 provides guidance for audits of management systems for quality and environmental management.
All These rules together form a coherent set of management system standards of quality that facilitate mutual understanding in national and international trade.

Thursday, May 15, 2008

Farming Business Proposal Poultry








Class Tuesday, May 13:

In this class we start with the "Workshop on Productivity in Construction." Which aims to:

• Obtain and develop general criteria of productivity.

• Exercise on techniques for continuous improvement of productivity in construction.

• Discuss the application of technical work in progress participants and make the findings.

This course is intended that participants will be able to implement methods, procedures and techniques for productivity improvements in the activities of civil construction processes. As well, should be able to bring productivity indicators enabling the analysis of the yields of the major construction items.

points raised in the Workshop:

1. The workshop began by explaining the basic processes that support human knowledge. These are:




2. Estate Planning Process. (Model)








3. Análisis de los defectos: el proceso

Seleccione un defecto
Identifique al “Equipo de Trabajo”
Mida los defectos. Cuantifique!!
Realice una Tormenta de Ideas para procesos de mejora.
Haga un plan de control de fallas.
Vuelva a medir: Continúe el proceso..


Mejoramiento Continuo.


4. Definiciones:


Productividad: Se define como la relación entre producción final y factores productivos (tierra, capital y trabajo) utilizados en la producción de bienes y servicios. En el área de la construcción se definiría como Cantidad de horas-hombre utilizadas para realizar una actividad, tomando como referencia una situación estándar.




Rendimiento: Es la cantidad de obra lograda por un operario en un tiempo determinado o es la cantidad de operarios que se necesitan para realizar una cantidad de obra en un tiempo determinado.







Eficiencia: Optimización de los recursos utilizados para la obtención de los resultados previstos (logro de los objetivos predefinidos). Se utiliza para dar cuenta del uso de los recursos o cumplimiento de actividades.







Effectiveness: The relationship between results achieved and the results that we set, and shows the degree of fulfillment of the goals we have planned: production quantities, customers will have, orders purchase place, etc..







Efficiency: Efficiency refers to the achievement of established goals directly related to the generation of results and the impact thereof with the fulfillment of objectives.

Ms Saga A New Dawn Gameshark Ecap

I FIGHT FOR CIVIL RIGHTS. Press Release

FIRST DAYS OF THE CIVIL RIGHTS STRUGGLE.

This weekend of May 16-17, is presented Coordinator Southeast fascist, so that various groups and coordinators perform a series of speeches about fascism is once again invading us.

encouraged to attend all those interested in talks, so as to participate actively.

http://www.antifasureste.blogspot.com


BELOW THE ACTIVITIES OF JORNDADAS (attached to this mail we send the poster sessions) :


EARLY DAYS STRUGGLE FOR CIVIL RIGHTS

· FRIDAY 16:

ü From 18:00 to 20:00 IMMIGRATION TODAY: given by M ª JOSE PACHECO ROCAMORA , Technical Immigration Molina City Council and will preside over the Regional Coordinated NGO ra de Murcia

ü From 20:00 to 22:00 HISTORY OF THE FIGHT AND RELEASE LGBT : Taught by Juani

coordinator of the Education Commission of the Collective Do not deprive

· SATURDAY 17:

- From 11:00 to 12:30 right movements HISTORY OF SPAIN: cu yos FERNANDO speakers will be WHITE and JCE (ml)

- ; From 12:30 to 14:00 struggle against patriarchy, in which speakers include:

ü VICTORIA RODRIGUEZ Celdran, local coordinator of IU in Cartagena

ü Canavate JAVIER ORTEGA, award-winning writer for the Women's Institute with an award for 'Male Murciano that has stood by its work for equality between women and men & # 39, and author of Mae's loneliness. Anthropological research on domestic violence.

ü ALICIA POZA Coordinating Committee 8 M ( to confirm attendance)

- 14:00 Popular Food

- From 17:00 to 18:30 OBJECTIVES AND CHALLENGES OF FASCIST MOVEMENT TODAY. PUBLIC PRESENTATION OF THE EAST antifascist , by:

ü CAMACHO (Communist Youth of the Region Murcia, UJCE).

ü RAMON (CNT)

ü LUIS MIGUEL (LGBT Do not deprive of the RM)

ü

and a representative of the PLATFORM ANTI FASCIST CARTAGENA

- From 18:30 to 21:00 PROJECTION OF A DOCUMENTARY AND POST-DEBATE DISCUSSION

- ; From 21:00 to 3:00 END OF DAYS, PARTY AND CONCERT , with performances by musical groups:

ü EH TXO http://www.myspace.com/ehtxo

ü ; DOKTOR POGO http://www.myspace.com/doktorpogo

OS WAIT!

AGAINST FASCISM AND VIOLENCE, NOW AND ALWAYS, RESISTANCE!


Monday, May 12, 2008

Eyebrows Dye Before And After

TUESDAY MAY 6 AND THURSDAY, MAY 8

Tuesday, May 6:

In Tuesday's class talked about how to make a report and what are its parts.

Outline of a Report.

To:

From:

Date:

Subject:

Objectives: Here is drawn the main objective of the report and the issues addressed.

Sustainability: The lift develop the themes and objectives.

Culture: in culture can be discussed other topics or objectives related to the theme of the report.

Collation: is a brief conclusion of the report.

In class we made an example with a letter of invitation to Congress to send the student center professionals.



Thursday, May 8

This class began to perform metric calculations for a project in Rio Chico, Miranda State .

El proyecto consta de:

- 20 Casas

- Es un Concurso Cerrado.

- El Promotor está requiriendo las cantidades de obra de:

- Paredes Bloque.

- Tuberías Aguas Negras.

Para calcular las cantidades de obra tenemos que tener en cuenta:

- Wall Blocks: square meters of wall and block type.

- Sewage Pipes: Pipes simple length, number of Y, elbows, etc.


Friday, April 25, 2008

Sample Agreement Of Beutician

the antifascist

The next day, May 1 neo-Nazi National Alliance organization has scheduled a call with the slogan "In defense of English workers" in the city of Cartagena. This organization is declared ideological heir to European fascism and has among its political precepts "right of blood" that should determine the national origin of the individual, that is defending a racist policy.

This training is also known to have several of his leaders imprisoned for terrorist acts against a busload of relatives of Basque prisoners.

From the Southeast antifascist show our disgust at the decision of the Delegation of the Government of Murcia allow for the completion of racist, xenophobic and fascist dyes clear in our region. And particularly in a city like Cartagena, multicultural and home to people from different places, in peace. Without doubt, we can only understand these actions as a way to provoke the citizens of our region and of inciting ethnic hatred between us. Beyond

honeyed words and gestures of good faith, these actions of the legitimate political class in fact, discriminatory and totalitarian ideologies.

We therefore demand the immediate banning of the demonstration

turn, call the Murcia town to show their revulsion at these acts of peaceful way. Through participation in the demonstration that the unions have called at 12:00 pm in the Plaza of Spain Cartagena, behind the banner of the Anti-Fascist platform Cartagena bearing the slogan: "native or foreign, the same working class"

demand the outlawing of all political, social or cultural precepts have in his defense racism and fascism. We believe that violate the Universal Declaration of Human Rights and the democratic pillars which we assume.

call on all citizens and social, political, labor, and especially immigrants to join this declaration and popularize.

TODAY AS YESTERDAY not pass!

BY ORGANIZATIONS outlawing of fascist and racist

Thursday, April 24, 2008

Clean Your Clitoris Smelly

Class of April 22, 2008

CI UM

In class, presented several key points, as as:

I. brief summary and discussion of the new 5929 law, the discussion will clear up some doubts and many dark sides to concern us all. One is that the 1417 decree still in force.

II. Mission and vision of the construction company (for simulation).

CIUM : Construction and Inspection Metropolitan University

Mission:

offering inspection, Projects and Management of Civil Works, to meet the needs of our customers for quality, response time and cost- benefit, working with a team of highly competitive and efficient by establishing harmonious working relations, collective benefits and professional development.

Vision:

As a leader in inspection services and quality control of civil works.

• Possess a flexible and efficient organizational structure that allows us to have national coverage with projection throughout the country, appealing for the formation of strategic partnerships with national or foreign capital.

distinguish ourselves by the permanence of their staff and their sense of belonging.

III. Unit: Fundamental principles of civil works inspection

This unit consists of:

a) Definition Inspection. "Inspection of Works is the exercise or professional services designed to ensure the smooth conduct of the work as a fundamental objective and addressing the overall objectives derived from the collective interest and specific objectives derived from the various interests involved in the total process work. "

b) Principles administrative

ü Planning

ü

Organization ü Integration

ü direction and control

c) Inspector Functions

ü Techniques: some of the main features is that the inspector should be fully aware of the plans and rules to follow during the execution of the work

ü Administrative . The inspector must possess qualities administrative.

ü Informative

ü Advisory

IV. Exhibition and definition of types of work and concrete curing.

1. Work Types

a) clean work: it is called in this way when looking for the concrete on its outer surface is completely smooth without any marks of the respective formwork

b) Obra Corriente. En esta obra no se busca obtener un acabado perfecto por la sencilla razón de que después de ser curado se le recubre mediante un friso

c) Obra vista. Se le denomina cuando el concreto puede quedar a la vista pero no necesariamente es obra limpia

2. Curado. Se le denomina como el manteniento de un adecuado contenido de humedad y temperatura en el concreto a edades tempranas, de manera que esta pueda desarrollarlas propiedades para las cuales fue diseñada la mezcla.


Rapporteurship developed by: Felix Herrera

Wednesday, April 23, 2008

Great Hardc Ore Love Songs

Position: Resident Engineer.

The Resident Engineer can be defined as specialized professional engineering in the field of the nature of the work, responsible for directing and the Contractor, implementation, according to the plans and technical specifications established in the project, ensuring the best use of equipment, tools, appropriate and necessary human resources; is responsible for carrying out the project entrusted to quality time and cost consideration. Meeting Safety Standards and Industrial Hygiene and in accordance the conditions laid down in the contract signed by the Contractor. The Resident Engineer is the technical representative of the Contractor on site and is responsible for planning, coordinating direct staff to work and if the various contractors involved in the work, such as: Contractors Electric, finishes, etc.. ago material requirements and develops timely construction progress reports, project execution and control activities, such as quality, organization, personnel, records, measurements, evaluations and other administrative acts like.

Reference: "Inspection Manual and residence Obres Works" Venezuelan Society of Civil Engineers

Felix Herrera.