Good morning, Class of yesterday 06/10/2008, continue with the workshop ponenecias productivity in construction, specifically the session # 6 "Gangs collaborative and PIC, including points discussed were:

* How is made a PIC?
short-range plan lasts for 15 days, so that each 7 is conducting the review of the plan and is prepared for the next quincenna.

The PIC, you have two faces:
* Front: This indicates the previous progress made, review the master plan, the list of incomplete activities, regoge executed man hours, predicts the time for each task, identify all tasks each activity, all the man hours devoted to each task for each activity and place all the information about the painting and the gang.
* Rear: Name of the project, each activity and task is placed MO future requirements, materials and equipment, described the need for information, documents and business plans, describes the need for information, plans and documents for each activity, place the number of people per crew, the balance of them if necessary, and develops the plan future contingency.

is this point we stopped to discuss how to perform the analysis of man-hours and performance as reflected carried H / h.

* Another point discussed in class yesterday was the relevance and ultilidad to conduct a post project review, which is nothing more than the book analyzes the work is complete, and it is called a one page report, which intrrogantes include the following: what happened?, why now?, what learning? and how could you do better?

* Daily work should consider: The identification of tasks to be completed, scheduling of work according to needs, the daily monitoring of the progress of work, among other activities.

* Returning to the theme of collaborative teams, are structured clarify this: You must hold meetings 2 times a day, AM: PM is planned and evaluated, should not take more than 10 min, check that you understand everything treaty and always emphasize the importance of safety!

* Role of teacher in the CC: this should be a facilitator of the process, indicate goals for performance and motivate the crew to share information and work.

* Role of teachers in the PIC'S

* How important is the construction supervisor? This takes between 60 and 100 day decisions that affect time, cost, quality or safety of the project

* Activity effective supervisor roles, our approaches were: technical competence, focuses on production, risk and cost, focuses on planning not only reception and quality and safety priority does

* Reasons for low productivity growth in the construction industry: among these are low investment in education and focus on results rather than process

* Items for increased productivity : Continuing education and practice and procedures
consistent
* For the ultimate in productivity workshop named the proram of 13 points to improve the construction productivist

* And stay final reflection: HAPPY TRIP ... QUALITY!
extra
As we explore the project and its use tool


ISABEL MULLER # 3202710